Posted by
Fladbury downstream track
New stone track built across the downstream meadow at Fladbury
Remember how it was trying to drive to the river across the downstream meadow at Fladbury?
Well the Fisheries Team (Colin and Spud) have built an all weather stone track across the meadow.
First they ordered the material,
hired some big boys toys,
and built the track.
The plan is to let the track bed in with use and then do a final leveling with the remaining material this winter.